6 - 4 - 3
2) Installation of Additional Equipment and Switches
Layout of Equipment and Switches
(1) Installing space of additional equipment
(2) Layout of switches and lamps
• Have been provided the installing space (H:150mm x W:180
mm ) at the center cluster which can be installed three kind of
additional equipment as a wireless radio, electrical equipment
and etc.
• Standard layout of switches and lamps are as following
figure.
• If you intend to install additional switches or lamps at
instrument panel for the convenience of body mounting, be
sure to install it at empty space after confirmation of original
condition of the actual vehicle.
Avoid using additional switches and lamps with
existing switches and lamps.
• If you install additional switches and lamps, fit a caution plate
showing the purpose of each switch, etc., to prevent
accidental operation or confirmation.
KK-XZU215C