Preparation For On-Site Adjustment - Mitsubishi Electric BAC-HD150 Instruction Book

Air-conditioner control system; bm adapter
Hide thumbs Also See for BAC-HD150:
Table of Contents

Advertisement

Step-2
HUB
BACnet
LAN1
LAN2
BAC-HD150
Step-1
PAC-SC51KUA
24VDC
AG-150A
8.2

Preparation for on-site adjustment

(Same as section 7.2 "Preparation for on-site adjustment")
Have the following tools and documents ready before performing on-site adjustment and a test run.
Item
Air conditioning control system diagram
Instruction Book that came with BAC-HD150
Instruction Book that came with Setting Tool
Reference
BAC-HD150 Installation Manual
Relevant air-conditioner and controller's
Instructions Books and Installation Manuals
Miscellaneous
Computer
USB memory
Installation CD for the Setting Tool
HUB
Tools and parts
Two LAN cables (category 5 or above) (straight cable)
General tools such as a driver
Tester
Miscellaneous
®
BACnet
®
HUB1
M-NET
PAC-YG50ECA
Outdoor unit
LAN
Outdoor unit
M-NET
PAC-YG50ECA
M-NET
PAC-YG50ECA
Description
BMS
HUB
M-NET
ME remote controller
M-NET
ME remote controller
Group configuration, IP address, Control item, and
etc.
(This document)
®
BACnet
notification items, destinations, and methods.
For Setting Tool
For setting data backup
Setup disk
For connection to Setting Tool
For connection to Setting Tool
Use to check wiring and voltage.
- 37 -
Indoor unit
Indoor unit
Notes
device list Documents related to
LOSSNAY
LOSSNAY

Advertisement

Table of Contents
loading

Table of Contents