Prodigy FlyPipe Studio Installation Guide Part Number: 8006M2110 Rev: D Released: 2020-11...
Page 2
To view a list of ETC trademarks and patents, go to etcconnect.com/ip. All other trademarks, both marked and not marked, are the property of their respective owners. ETC intends this document, whether printed or electronic, to be provided in its entirety.
Table of Contents Introduction Document Conventions Help from ETC Technical Services Overview Safety and Warnings Working Load Limit (WLL) Hoist Specifications Electrical Specifications Interface with Building Lifting Specifications Control and Feedback Hoist Local Controls Initial Hoist Installation Tools Needed Prepare the Installation Location...
Page 4
Configure and Test Hoist Operation Verify Hoist Function Travel Limits Set and Test your Limits To Set and Test the Lower Limits To Set and Test the Upper Limits Verify Hoist Address Examine the System Prodigy FlyPipe Studio Installation Guide...
Introduction Welcome to the Prodigy FlyPipe Studio Installation Guide. This document provides details on how to install, test and manually operate a FlyPipe Studio hoist. Document Conventions This document uses the following conventions to draw your attention to important information.
Help from ETC Technical Services If you are having difficulties and your problem is not addressed by this document, try the ETC support website at support.etcconnect.com or the main ETC website at etcconnect.com. If none of these resources are sufficient, contact ETC Technical Services directly at one of the offices identified below.
The Overview chapter provides safety information as well as various hoist specifications. Safety and Warnings Only ETC Rigging trained personnel are authorized to install and configure FlyPipe Studio hoists and any related equipment. Read this entire installation manual before installing equipment.
All Prodigy hoists have a Working Load Limit. This is identified on the product label on the side of the motor box. All Prodigy FlyPipe Studio hoists have a Working Load Limit of 136 kg (300 lb). Prodigy Working Load Limits include a design-safety factor.
Lifting Specifications Motor lifting capacity of 136 kg (300 lb) • Up to 7 m (23 ft) of vertical travel • Hoist is a zero fleet angle self-climber • The hoist contains two pairs of lift lines, with spacing between at 1.78 m (5 ft 10 in) •...
946 mm (37 in) Note: If your attachment points are not spaced according to the requirements above, contact your ETC Project Manager or Technical Services. For contact information, see Help from ETC Technical Services on page Prodigy FlyPipe Studio Installation Guide...
Unpack the Hoist When you open the box, your hoist is lying on its side. There is also a smaller box inside the large box that includes the TwinLine wire rope, TwinLine clamps, SafeStop brakes, and stop sleeves for terminating the wire rope to the drum.One end of the wire rope is pre-terminated to the TwinLine clamp and the other end is loose, with the excess spooled inside cardboard.
Page 12
4. Using a 3/8 in hex key, tighten the socket cap screw so the channel nut rotates 90 degrees against the walls of the strut channel and until the nut is snug against the bottom of the strut channel. The recommended torque range for this is 68–88 Nm (50–65 ft-lb). Prodigy FlyPipe Studio Installation Guide...
Basic management of your power and data cables can be done using cable cradles. If you use a cable swag for your FlyPipe Studio hoist, it is recommended that you use a split mesh rod closing grip strain relief solution, such as ETC part number HW6971, at the swag hook position. Install Helix Cable Management...
5. Repeat steps three and four for the second nylon webbing strap. 6. Cut and remove the white cable ties that hold the cable assembly together and run the length of the cable assembly back down to the hoist. Prodigy FlyPipe Studio Installation Guide...
7. Once you have installed the TwinLine clamp, you must thead the TwinLine pair of wire ropes through the center grommet of each rib, beginning from the topmost rib and moving downward. Attach the Platter to the Hoist In these steps, you’ll need to have the TwinLine clamp and cable assembly positioned above the hoist so there is space to attach the platter.
Note: There is a mark on the nylon webbing that is 457 mm (18 In) below the bottommost rib. This mark should be approximately at the point where the webbing loops through the platter. Prodigy FlyPipe Studio Installation Guide...
Chapter 4 Finalize Hoist Installation After assembling your hoist and installing cable management, there are a couple additional items required before you can start running the hoist. Terminating the lift lines to the drum is the next logical step, but before you can perform this task you need to power the hoist and ensure the wiring is oriented properly and the motor is running in the correct direction.
E-stop Termination Bypass Plug (ETC part # 8050B7002) into the nine-pin male connector receptacle on the top of the motor box. This completes the circuit and allows you to temporarily operate the hoist from the local controls.
If you are installing a 120/208V hoist, you can use the Prodigy Phase Checker (ETC part number 8055A4013). For 277/480V hoists, use a standard 3-phase checker that is rated for 480VAC, similar to the 480V phase checker you can purchase through ETC (part# M7639).
SafeStop device was resting. Thread the lift lines through the holes and pull them through the bottom of the hoist down to the ground. Prodigy FlyPipe Studio Installation Guide...
Step 3: Attach Stop Sleeves to Lift Lines 1. Pull the first lift line down to the floor until it is taut and the cable equalizer plate is fully rotated. Ensure it is plumb to the TwinLine Cable Equalizer Plate clamp.
3. Push the SafeStop latch back up into the device so it is resting above the notch on the bottom set of jaws. 4. Remove the tool and replace the plug on the top of the SafeStop device. Prodigy FlyPipe Studio Installation Guide...
To accomplish this, you will likely need one person or one TwinLine Tension Clip (ETC part # 8006A4033) per TwinLine set to hold the lines up and away from the hoist until they are taut and continue holding them as the hoist is raised off the ground. If you run the hoist up with slack lines, you could cause damage to the hoist.
8. Verify that the hoist is moving downwards. CAUTION: Do not run the hoist below its original low trim position, as there is no more cable on the drum. Doing so can cause damage to the hoist. Prodigy FlyPipe Studio Installation Guide...
Travel Limits Once you have verified proper wiring and hoist function, the next step is to set the travel limits. These limits provide protection for the hoist and anything around it by safely limiting the range of travel. This is done by positioning your limit switches. The hard travel and overtravel limits are separated by 13 cm (5 in) of travel, which cannot be modified.
8. If necessary, adjust the lower limit switch as needed to attain the desired hard limit. Note: Using local controls to move the hoist does not override the limits you have set. Prodigy FlyPipe Studio Installation Guide...
To Set and Test the Upper Limits 1. Loosen the two Phillips screws on the bottom of the upper limit switch (furthest from the motor) and move it to the approximate position you want. 2. Tighten the screws so the switch is stationary. 3.