Control Panel - Champion 100165 Operator's Manual

7500w dual fuel electric start generator
Table of Contents

Advertisement

100165 - 7500W DUAL FUEL ELECTRIC START GENERATOR

Control Panel

1
2
1. Fuel Selector Switch – Used to select and turn on gasoline
or propane (LPG) fuel source.
2. LPG Inlet – Used to connect LPG fuel source to generator.
3. Ignition Switch – Used to START or STOP the generator.
When operating by propane, this switch will NOT stop the
engine.
4. Intelligauge – Three mode digital meter for displaying total
run time, voltage and hertz.
5. Battery Switch – Enables/disables starting electrically.
6. Ground Terminal – Consult an electrician for local grounding
regulations.
7. Circuit Breakers (Push Reset) – Protects the generator
against electrical overloads.
3
A
b
6
11
4
5
C
RECEPTACLES
120V AC, 30A Locking (NEMA L5-30R)
W
May be used to supply electrical power for
A
operation of 120 Volt AC, 30 Amp, single phase,
60 Hz electrical loads.
120/240V AC, 30A Locking (NEMA L14-30R)
Y
May be used to supply electrical power for
B
operation of 120/240 Volt AC, 30 Amp, single
phase, 60 Hz electrical loads.
(4×) 120V AC, 20A GFCI (NEMA 5-20R)
C
May be used to supply electrical power for
C
operation of 120 Volt AC, 20 Amp, single phase,
60 Hz electrical loads.
CONTROLS AND FEATURES
7

Advertisement

Table of Contents
loading

Table of Contents