Snow Blower Pre-Operation Inspection/Service - Schulte SBX-75/87 Operator's Manual

Snow removal
Table of Contents

Advertisement

Air filter condition

11.2 Snow Blower Pre-Operation Inspection/Service

Before each implement use, a complete inspection and service is required to ensure the implement is in a
good and safe working condition. Damaged and/or broken parts should be repaired and/or replaced
immediately. To ensure the implement is ready for operation, conduct the following.
The operator's manual and safety signs affixed on
the unit contain important instructions on the safe
and proper use of the equipment. Maintain these
important safety features on the implement in good
condition to ensure the information is available to
the operator at all times.
Ensure the manual canister is secured to the
equipment with the operator's manual inside.
Ensure all safety signs are in place and legible.
Replace missing, damaged, and illegible
decals. OPS-U- 0011
Check that the main driveline is securely
attached to the tractor and the locking collar is
seated in the groove of the PTO shaft.
Inspect that the 3-point hitch pins are the
proper size, correctly installed, and secured to
the tractor lift arms with retaining pins inserted.
OPS-SB-0007_A
When attaching the Implement input driveline to the Tractor PTO, it is important that the
connecting yoke spring activated locking collar slides freely and the locking balls are seated
securely in the groove on the Tractor PTO shaft. Push and pull the driveline back and forth
several times to ensure it is securely attached. A driveline not attached correctly to the
Tractor PTO shaft could come loose and result in personal injury and damage to the
Implement.
SBX-75/87 04/19
© 2019 Alamo Group Inc.
OPERATION
(S3PT-17)
Operation Section 4-21

Advertisement

Table of Contents
loading

Table of Contents