FIELD OPERATION
1. Rephase cylinders before starting field operation.
2. Choose a flat spot in a field to set tillage depth and level machine.
The operator is responsible for adjusting machine since machine does not come "Field
Ready" from factory.
3. Determine desired tillage depth by working test strips within the field.
NOTE: Optimum performance of machine is achieved by tilling at a depth and moving at a
speed that does not go beyond limit of trip assemblies. This limit is exceeded if connecting
bolt (shown in the following drawing) continually rides above trip assembly cap.
SECTION 3 – OPERATION
IMPORTANT!
3-6
Need help?
Do you have a question about the CoulterChisel CC2815 and is the answer not in the manual?