Download Print this page

Advertisement

Quick Links

POP-UP OPTION
U S E R H A R D W A R E M A N U A L
0019850_REV_B
8/29/2018
EdgeTech
4 Little Brook Road
West Wareham, MA 02576
Tel: (508) 291-0057
Fax: (508) 291-2491
www.EdgeTech.com

Advertisement

loading

Summary of Contents for Edgetech Port Pop-Up

  • Page 1 POP-UP OPTION U S E R H A R D W A R E M A N U A L 0019850_REV_B 8/29/2018 EdgeTech 4 Little Brook Road West Wareham, MA 02576 Tel: (508) 291-0057 Fax: (508) 291-2491 www.EdgeTech.com...
  • Page 2 The information, figures, and specifications in this manual are proprietary and are issued in strict confidence on condition that they not be copied, reprinted, or disclosed to a third party, either wholly or in part, without the prior, written consent of EdgeTech. Any reproduction of EdgeTech supplied software or file sharing is strictly prohibited.
  • Page 3: Pop-Up Assembly

    The PORT LF-SD and PORT MFE can be shipped as pop-up buoy system. This allows the unit to float to the surface upon detaching from a payload. 1.1 Pop-Up Assembly PORT Pop-Up system is shipped assembled. If Pop-Up canister was purchased separately it will consist of: • (1) Top (Flotation) Cup •...
  • Page 4 1. Make sure that when selecting the line to be used it is of proper strength and material for the application. EdgeTech recommends a premium double braided nylon rope. 2. Attach the end of the line to the outside and inside of the bucket with Zip ties and attach the end of the line to the chain at the bottom of the bucket with a shackle as pictured below.
  • Page 5 3. Flake the line into the bottom of the bucket, going around 2/3rds of the way around the center and then back, continue flaking back and forth advancing further around each time so the line lays evenly around the center post. illustrate how to load the line.
  • Page 6 1.3.1 To Assemble the Pop-Up 1. Install top collar on the PORT release by sliding it on the release end up to the transducer. Do not tighten the clamp: this will be done when the Pop-up assembly is completed. Figure 1-4: The PORT LF-SD Top Collar with Clamp Figure 1-5: Installed PORT LF-SD Top Mating Collar...
  • Page 7 Figure 1-6: The PORT MFE Transducer with Clamp Figure 1-7: Installed PORT MFE to Pop-Up...
  • Page 8 2. The release is mated to the top cup by sliding the release down the opening in the flotation, so the top collar lies flush with the top of the cup. Figure 1-8: Inserting Release into the Top Cup from Above 3.
  • Page 9 EdgeTech recommends utilizing the small holes lining the lip notch with light duty zip ties to secure line tightly to the outside of the cup.
  • Page 10: Mechanical Drawings

    Pop-Up Parts List PART CUP BOTTOM PORT POP-UP MTL 1 CUP TOP PORT POP-UP W/ FOAM 200M RATED MTL 2 CLAMP PORT POP-UP DELRIN MTL 3 .92 ft RUBBER STRIP NEOPRENE 0.25 INCH THICK 01 INCH WIDE MTL 4 HARDWARE BOLT STD MACHINE HEX HD 3/8-16 X 5.0 INCH GALVANIZED STEEL MTL 6 HARDWARE WASHER STD SPLIT LOCK 0.375 ID 0.68 OD 0.09 GALVANIZED STEEL...
  • Page 11 Figure 1-11: Flotation Pop-Up Assembly - 0015784...
  • Page 12 1-10 Figure 1-12: PORT Pop-Up Canister 200M Assembly - 0010838...
  • Page 13 Figure 1-13: PORT MFE Pop-Up Canister 200M Drawing – 0019077...
  • Page 14 Figure 14: PORT LF-SD Pop-Up Canister 200M Drawing - 0015749...