P5/8/08
Page 18 of 26
Equipment Plan and Elevation
The standard water quality system with electric heater requires about 4' x 5' of
floor/ground space. The water quality equipment can be arranged horizontally or vertically
to fit specific spaces. 36" minimum vertical clearance is required to remove the filter
cartridge. As mentioned previously, suitable drainage must be provided at both the
Fastlane Pool and the water quality system. All electric components must be located,
installed and bonded by a licensed local electrician in accordance with applicable codes.
WARNING: ALL CIRCUITS MUST BE GFI PROTECTED.
Need help?
Do you have a question about the FASTLANE POOL and is the answer not in the manual?
Questions and answers