Adhesive Mounting Installation - Renishaw VIONiC RSLM20 Installation Manual

High accuracy linear encoder system
Table of Contents

Advertisement

Adhesive mounting installation

1.
Thoroughly clean and
degrease the substrate
with a lint-free cloth.
Clean underside of scale using approved solvents
('Storage and handling', page
3).
4.
Thoroughly mix and apply epoxy
then remove remaining
backing liner.
Area for RGG‑2 epoxy
(A-9531-0342)
Locate scale against dowels or ledge and
5.
rotate down onto substrate. Press down
with firm finger pressure.
VIONiC RSLM20/RELM20 installation guide
2.
Mark area for epoxy on
adhesive tape.
6.
Support
dowels
Mounting ledge
Remove backing liner from one side
3.
and stick to underside of scale.
OR
7.
Remove
excess
epoxy.
8.
Allow 24 hours for epoxy to cure fully, then
clean scale using Renishaw scale wipes
(A-9523-4040) or a clean, dry, lint-free cloth.
7

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vionic relm20

Table of Contents