Clip/Clamp Mounting Installation - Renishaw VIONiC RSLM20 Installation Manual

High accuracy linear encoder system
Table of Contents

Advertisement

Clip/clamp mounting installation

1.
Thoroughly clean and
degrease the substrate
with a lint-free cloth.
Clean the underside of scale using approved solvents
('Storage and handling', page
3).
3.
Fit the remaining clips using clip setting shim M-9584-0928
(provided with A-9584-2050 clamp set).
VIONiC RSLM20/RELM20 installation guide
2.
Fit clips on one side of the scale and align to the specification given in the installation
drawing. Only the special low‑profile screws supplied with the clips should be used.
Additional screws can be purchased from Renishaw (A-9584-2047 pack of 25).
NOTE: When mounting scale to vertical surfaces, temporary bridge clamps
(A‑9584‑2112) are available which support the scale prior to fitting clips.
Torque 0.5 Nm
4.
Place datum clamps against the scale and secure using the
special M3 low‑profile screws supplied.
Torque 0.5 Nm
Clean scale.
5.
9

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vionic relm20

Table of Contents