C
200-240 V main inlet
D
100-240 V secondary or UPS inlet
1. Remove the rear cover of the projector by unscrewing the six captive screws.
2. On the back right side of the projector, remove the four screws holding the AC receptacle
knockout plate.
The AC supply is routed to the terminal block through an appropriate strain relief mounted on
this knockout plate.
Cinema 4K-RGB Installation and Setup Guide–CP4315-RGB, CP4320-RGB, CP4325-RGB, CP4330-RGB
020-102710-08 Rev. 1 (03-2021)
Copyright
©
2021 Christie Digital Systems USA, Inc. All rights reserved.
Installing and setting up
24