Preparing for operation
9. Preparing for operation
Figure 30:
System configuration
example
Figure 31:
Procedure before
operation
9.1 System configuration and start-up procedure
This section provides procedures before operation with the following system
configuration example.
Start
Mount modules.
Wire cables.
Configure station numbers.
Configure the parameters of
the WS0-GCC1.
Configure the parameters of
the master station.
Power on the WS0-GCC1
again.
End
MELSEC-WS
56