S-Box Installation And Connection - Samsung IER Series Installation Manual

Led display
Hide thumbs Also See for IER Series:
Table of Contents

Advertisement

6. S-Box Installation and Connection

• Precautions for installing S-Box
Installing it in a 19-inch server rack is recommended.
※ When connecting two or more times for the purpose of using multi-link HDR, install it on the ground shielded rack and use it. (SBB-
SNOWJMU model)
Make sure the air vent is open and not overturned or turned sideways.
Exercise caution to ensure that the air vent is not covered by an object. Covered air vent may cause overheating of the product.
If installing multiple S-Boxes, make sure there is a gap of at
If installing an S-Box onto a wall, make sure there is a gap of at least 10 mm between the wall and the top, bottom and sides of the
product. Make sure there is a gap of at least 50 mm between the cable ports and the wall to ensure proper cable connection.
Maintain the residual heat inside the rack at a temperature below 35°C.
Exercise caution to ensure that no liquid enters the air vent of the product.
SBB-SNOWJAU / SBB-SNOWJMU
1U (44.45 mm) from the product at the top.
least
43
LED R&D Lab(VD)

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ier-f seriesIfr seriesIfr-f seriesLh0 ier ls seriesLh0 ier fs seriesLh0 ifr ls series ... Show all

Table of Contents