6. S-Box Installation and Connection
• Precautions for installing S-Box
Installing it in a 19-inch server rack is recommended.
①
※ When connecting two or more times for the purpose of using multi-link HDR, install it on the ground shielded rack and use it. (SBB-
SNOWJMU model)
Make sure the air vent is open and not overturned or turned sideways.
②
Exercise caution to ensure that the air vent is not covered by an object. Covered air vent may cause overheating of the product.
③
If installing multiple S-Boxes, make sure there is a gap of at
④
If installing an S-Box onto a wall, make sure there is a gap of at least 10 mm between the wall and the top, bottom and sides of the
⑤
product. Make sure there is a gap of at least 50 mm between the cable ports and the wall to ensure proper cable connection.
Maintain the residual heat inside the rack at a temperature below 35°C.
⑥
Exercise caution to ensure that no liquid enters the air vent of the product.
⑦
SBB-SNOWJAU / SBB-SNOWJMU
1U (44.45 mm) from the product at the top.
least
43