6. S-Box Installation and Connection
• S-Box connection
⑨ Finishing the HDBaseT cable after installation
 Using shielded STP RJ45: Use a shielded RJ45 connector, and a CAT 6 or CAT 7 connector using a plastic load bar.
 Insertion of conductors (conducting wires) into plastic loader: Insert conducting wires into the RJ45 connector, as shown by
the conducting wire structure (T-568B) in the following figure. Plastic load bar is required. (The reason is that the thickness of a
CAT 6 cable prevents the cable from being placed flatly in an RJ-45 connector, unlike general CAT 5 cables.)
Load bar
Load bar and drain wires
46
Wires aligned with load bar