Samsung IER Series Installation Manual page 48

Led display
Hide thumbs Also See for IER Series:
Table of Contents

Advertisement

6. S-Box Installation and Connection
• S-Box connection
⑩ Finishing the HDBaseT cable after installation
Pushing in of plastic loader to fullest extent: Push the plastic load bar as close as possible to the cable.
Use a wire stripper to cut all conductors (conducting wires) down to a length of about 0.5 inches.
With drain wire: Refer to the next page.
※ Without drain wire: Use copper foil to contact the connector shell part, as shown below.
Fold aluminum foil or braid back and wrap it with copper foil.
Copper foil
47
Connector shell
LED R&D Lab(VD)

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ier-f seriesIfr seriesIfr-f seriesLh0 ier ls seriesLh0 ier fs seriesLh0 ifr ls series ... Show all

Table of Contents