Samsung IER Series Installation Manual page 50

Led display
Hide thumbs Also See for IER Series:
Table of Contents

Advertisement

6. S-Box Installation and Connection
• S-Box connection (Redundancy)
① If a redundancy feature is required
Use the OCM cable to connect the DATA IN port on the Interface Gender to the DATA OUT port on the last cabinet.
SNOW-1801U
• Use 15–100 m long CAT 6 *STP and *FTP level cables
to ensure HDBT signal stability.
• Do not bend cables or bind multiple cables together.
49
LED R&D Lab(VD)

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ier-f seriesIfr seriesIfr-f seriesLh0 ier ls seriesLh0 ier fs seriesLh0 ifr ls series ... Show all

Table of Contents