Preparation For Cabinet Installation - Samsung IER Series Installation Manual

Led display
Hide thumbs Also See for IER Series:
Table of Contents

Advertisement

2. Preparation for Cabinet Installation

◆ Preparation for installation
① Remove the tape on top of the package box and open the box. (See Fig.1.)
② Remove the Top–Cushion and open the shielding bag.
Hold the handles inside, take out the set, and then remove the PE bag. (See Fig.2.)
③ Check that the sliding bolts are properly fastened. (See Fig.3.)
Bottom-
Cushion
■ IER
■ IER- F
Fig.1 Contents of the
package
IB &
cable
LED
Top-
set
Box
Cushio
n
Bottom-Cushion
IB & cable
Top-Cushion
Box
Fig. 2 Opening the
package
handl
e
Handle Shape
LED set
24
Fig.3 Checking the bolts
SLIDING BOLT
SLIDING
BOLT
LED R&D Lab(VD)

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ier-f seriesIfr seriesIfr-f seriesLh0 ier ls seriesLh0 ier fs seriesLh0 ifr ls series ... Show all

Table of Contents