Download Print this page

Preparation Of Cabinet Installation - Samsung IAB Series Installation Manual

Hide thumbs Also See for IAB Series:

Advertisement

2. preparation of Cabinet installation

◆ Pre-prepare before installation
① Remove the tape of the top BOX and open it.
② Remove the top–cushion.
③ Check the set status. (Two rear parts and four front parts)
Top-Cushion
Accessory
Box
Fig.1 Packing
Right1
Right2
LED set
Bottom-Cushion
Fig. 2 Packing out
(Fig.2)
(Fig.3)
Left1
Left2
17
Fig.3 check the SET
LED R&D Lab(VD)

Advertisement

loading

This manual is also suitable for:

Lh008iab seriesLh012iab seriesLh016iab series