S
TART THE
4
This chapter summarizes what happens when you
power on your Switch 4007 after you have installed
all the switch components.
Before you power on the Switch 4007, review the
setup tasks (Figure 16 on page 29) and make certain
that all the tasks have been performed.
Power On the Switch
Attach the power supply cables to the connections on
1
the Switch.
Plug the power cord into the electrical socket.
2
Turn on the power switch.
3
Watch the LEDs on installed modules
4
To verify that the Switch 4007 modules have been
installed correctly, examine the LED status on each
module. To obtain information about a module's LEDs
and status indicators, see the User Guide, Getting
Started Guide, or Quick Start Guide specific to that
module.
S
WITCH
What Occurs During Startup
After you turn on the power switch, the following
occurs:
The power supplies begin operating.
The fans start rotating.
The Enterprise Management Engine LEDs blink
green.
Table 7 shows the sequence of characters that appear
on the EME management module LED character
display during a switch power-on.
Table 7 The EME LED Character Display During Power-on
Characters in Display Indication
random characters
Power-on has begun.
none (blank display)
Power-on continues.
The EME is running self-diagnostic
Diag
tests.
The EME is calculating the checksum
Cksm
value.
The EME is in standby mode, if it is a
Stby
backup.
The EME is active and ready, if it is a
Rdy
master.
Need help?
Do you have a question about the 4007 and is the answer not in the manual?
Questions and answers