Maintenance Information
Corrective Action Required
Note: If correction action is required on any item, attach sheet indicating problem and action taken.
All items have been properly checked and tested and found to be operating satisfactory or necessary corrective
action has been completed.
Inspected By:
Date
MHP13/35 & MHP15/44 V3 – 13619-2
Rev B
page xiii