Vents VUT 300 V2 MINI EC A2 User Manual page 9

Heat and energy recovery air handling unit
Table of Contents

Advertisement

Mounting using L-shaped mounting brackets with the service panel on the bottom (only for the VUE units)
The unit may be installed close to the ceiling or may be suspended using the threaded rods.
Dowel
Vibration absorbing rubber
Screw
Mounting using L-shaped mounting brackets with the service panel on the left
Install the unit on the pre-mounted floor supports, minimum 150 mm height, to ensure sufficient access for the drain pipe connection
to the U-trap and for condensate drain system installation.
www.ventilation-system.com
min 400 mm
150 mm
THE UNIT MUST BE MOUNTED ON A PLANE SURFACE.
MOUNTING OF THE UNIT TO AN UNEVEN SURFACE CAN LEAD TO THE UNIT CASING
DISTORTION AND OPERATION DISTURBANCE.
Threaded rod
Washer
Vibration absorbing rubber
Washer
Nut and lock nut
min 250 mm
min 400 mm
UNIT FLOOR MOUNTING
Nut
150 mm
min 400 mm
9

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents