Vents VUT 300 V2 MINI EC A2 User Manual page 12

Heat and energy recovery air handling unit
Table of Contents

Advertisement

VUT/VUE 300 V2/H2 mini EC
CONDENSATE DRAINAGE SYSTEM CONNECTION
The 300 VUT V2/H2 mini EC heat recovery units require condensate drainage.
The hole for the drain pipe is at the bottom of the unit. Remove the plug from the hole, open the service panel and install the drain pipe
from the delivery set into the hole, then connect the drain pipe to the sewage system using the SG-32 U-trap kit (available upon separate
order).
Sewage system
Drain pipe
Drain hose
min 3°
U-trap
Sewage pipe
Ø 32 mm
The VUE 300 V2/H2 mini EC energy recovery units do not require condensate drainage, as they are equipped with an enthalpy heat
exchanger.
www.ventilation-system.com
12

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents