16. Have a certified electrician provide power to the seed treating system. Provide
convenient shutdown switches, comply with local electrical codes and ensure that
the system is properly grounded and bonded. The USC system must be connected
to the same electrical requirements as specified in the main control panel on the
power requirement tag, or the electrical schematic shipped with the piece of
equipment. This will power the USC LPV seed treater and any attached
conveyors.
17. It is required that the air supply have an in-line customer supplied air dryer to
protect the air system from contamination. Supply approximately 100 - 110 pounds
of air pressure from the dryer to the port on the weight belt controls pad.
18. Reverse the previous steps when removing the machine from its working position.
NOTICE
AVIS
LPV WEIGH BELT SEED TREATER
16
16
Flexible conduit is recommended for main power supply.
Conduit flexible est recommandé pour l'alimentation princi-
17