USC LPV Operator's Manual page 27

Weigh belt seed treater
Hide thumbs Also See for LPV:
Table of Contents

Advertisement

1
7
12
10
11
1. Connect a cable with four pin connector to one of the two Powerlink connectors on
the MCP. Connect the other end to the Powerlink connector on the closest control
panel. Repeat this process until all control panels are connected. It may be MCP to
Treater to Tri-Flo® to Bin Site panel. The order or number of devices is not
important. It is important that all panel are connected. All pump stand control
panels will need to connected in a similar configuration.
2. Connect to the cable at the top of the remote I/O block on the weigh belt to PJ3712.
3. Connect to the load cell on the weigh belt.
4. Not used with the weigh belt.
5. Plug power cable from inlet conveyor here. Max 7.5 HP.
6. Plug power cable from outlet conveyor here. Max 7.5hp.
2
8
LPV WEIGH BELT SEED TREATER
VERSION 4 LPV TREATER CONNECTIONS
(Except 575v / 3ph)
3
2
9
8
13
4
5
15
14
6
Page 27

Advertisement

Table of Contents
loading

Table of Contents