Memory Check - Sharp R-21ATP Operation Manual

R-21at operation-manual gb
Hide thumbs Also See for R-21ATP:
Table of Contents

Advertisement

A30317, SUK R-21AT O/M

MEMORY CHECK

You can check the information programmed into the memory.
CHECKING TIME AND POWER LEVEL
Example: If you want to know the information programmed into the memory 1, memory 1 has been programmed for
4 minutes on 60% for the 1st sequence and 2 minutes on 30% for the 2nd sequence.
Step
Procedure
1
Press the CHECK pad.
2
Press the NUMBER pad
Note: 1. To cancel MEMORY CHECK, press the CHECK pad.
2. When
is displayed at Step 1, the memory is not set.
3. To check the time constant for double quantity, press the DOUBLE QUANTITY pad and the desired
NUMBER pad in step 2.
Pad Order
.
11
Display
NO.
NO. will flash on and off.
NO.
CHECK
After about 1 sec.
CHECK
CHECK
CHECK
CHECK
REPEAT

Advertisement

Table of Contents
loading

This manual is also suitable for:

R-21at

Table of Contents