To Install The Discharge Grille; Opening And Closing The Unit; About Opening The Units - Daikin EWAA0 DAV3P Series Installer's Reference Manual

Packaged air-cooled water chillers and packaged air to water heat pumps
Table of Contents

Advertisement

7
|
Unit installation

7.2.6 To install the discharge grille

7.3 Opening and closing the unit

7.3.1 About opening the units

Installer reference guide
60
a
2 Remove the burrs, and paint the edges and areas around the edges using
repair paint to prevent rusting.
NOTICE
When making knockout holes, do NOT damage the casing and underlying piping.
1 Insert the hooks. To prevent breaking the hooks:
▪ First insert the bottom hooks (2×).
▪ Then insert the top hooks (2×).
2 Insert and fix the screws (4×)(delivered as accessory).
1
2
4 N • m
T25
At certain times, you have to open the unit. Example:
When connecting the electrical wiring
When maintaining or servicing the unit
2
1
EWAA011~016DA + EWYA009~016DA
Packaged air-cooled water chillers
and packaged air to water heat pumps
4P620242-1 – 2020.06

Advertisement

Table of Contents
loading

Table of Contents