To Install The Discharge Grille - Daikin ERRA08-12EW1 Installer's Reference Manual

Table of Contents

Advertisement

7
|
Unit installation

7.3.6 To install the discharge grille

Installer reference guide
88
NOTICE
If the unit is installed in a cold climate, take adequate measures to prevent freezing
condensate from affecting the unit or its surroundings negatively. We recommend
the following:
If a drain hose is required: Prevent condensate freeze up in the drain hose with a
field supply drain hose heater with thermostat (external power supply). Insulate
the drain hose.
If no drain hose is required: Make sure condensate which drains from the unit
and freezes does not damage the surroundings of the unit or create slippery ice
patches.
ð In both cases the drain plug must be installed.
NOTICE
Provide at least 150  mm of free space below the unit. Additionally, make sure the
unit is positioned at least 100 mm above the expected level of snow.
Use the drain plug (with O-ring) for drainage.
1
c
a Drain hole
b O-ring (delivered as accessory)
c Drain plug (delivered as accessory)
NOTICE
O-ring. Make sure the O-ring is installed correctly to prevent leakage.
INFORMATION
Electrical wiring. Before installing the discharge grille, connect the electrical wiring.
2
a
b
ERRA08~12E + ELVH/X12S18+23E
Daikin Altherma 3 R MT F
4P708474-1 – 2023.05

Advertisement

Table of Contents
loading

Table of Contents