7.0 Smootharc TIG 200 DC installation
Installation for TIG setup
3 4
1
7.1
Installation for TIG welding
1
Plug the work return lead into output socket
2
Connect work return clamp to the work piece.
3
Plug the 8-pin plug of TIG torch into the welding machine
control socket.
4
Plug gas and electric connector of TIG torch to welding machine's
gas and electric socket, and tighten firmly.
5
Connect gas regulator to gas cylinder.
6
Connect one end of gas hose to gas outlet of gas regulator. Fasten
the hose clamp. Connect the other end to gas inlet on rear panel of
welding machine.
7
Connect with single phase 240V power supply. Turn power switch ON
(switch is located on the back of the welding machine).
6
2
, and tighten firmly.
5
7
15A
BOC Smootharc TIG 200 DC Operating Manual
33