Putting Into Operation; Safety - ATTACK ELECTRIC EASY Series Instructions For Use Manual

Wall hung electric boiler
Table of Contents

Advertisement

or placed to another place.
The boiler has to be connected by the nut with flat ring
sealing.
It is necessary to connect the heating water inlet with
a filter and shut off valves.
It is necessary to leave a free space on both side walls
of the boiler 100 mm and minimally 400 mm from the
top for after sales service. In case that you will not
observe this request for free space you have to pay
dismantling and mounting the boiler back to the wall
and to heating system, it is not repair paid in
guarantee period!

1.3.2 Putting into operation

Putting the boiler into operation has to be carried out
only by authorized professional company or service
person that has an valid agreement signed with the
producer. The list of these companies is enclosed.
The company or person who will put the boiler into
operation has an obligation to assure repairs of
breakdowns or defects in guarantee period. In case
that this company doesn't exist anymore, the
guarantee repair will be assured by any company from
the list closed to you.
By putting the boiler into operation the authorized
person is obligated to:
†control connections of the boiler to electric supply
network and to heating system
†control tightness of the boiler
†control all functions of the boiler
†inform the user about boiler operation, its control and
maintenance
†inform the user about safety dimensions from sides of
the boiler from flammable walls and its protection
according to ČSN 061008 and ČSN 730823.
To fulfil requests for boiler safety and economic
operation it is necessary to observe below mentioned
conditions:
†for boiler mounting and installing the user has to get
the permission from the company who is a distributor
of electricity in your region, control the input of the
boiler if it is in accordance with the input stated in the
permission
† the company carrying out the mounting is responsible
to observe the technical project and concrete
correlative norms and regulations regarding the
mounting and installing of direct heated electric boilers
in central heating systems.
† for mounting of the boiler it is necessary to have an
authorized technical project for heating system and for
connection of the electric boiler
† the boiler is able to be mounted only in an
environment according to its determination and
according to the project.
Manipulation, operation, using, control and
maintenance of the boilers are forbidden if it is not in
accordance with rules and directions of this instruction
manual. It is forbidden mainly to disconnect any of
safety units or elements in the boiler!!!
If the guarantee list is not filling fully, it is not valid.
NOTICE! If you take the boiler from
colder environment to warmer (for
example if the outside temperature is
below 0° C or 0° C and you want to
m o u n t i t i n s i d e ) , p l e a s e w a i t
approximately 2 hours
1.3.3 Operation of the boiler
The boiler has to be controlled and used only
according to advices and instructions stated in this
instruction manual, only by adult person who was
posted in maintenance of the boiler. Putting the boiler
into operation will made by authorized service person
during the heating test.
Any manipulation, operation, using and maintenance
of the boiler, which is not in accordance with
instructions and advices stated in this instruction
manual, is inadmissible. The producer is not
responsible for damages caused by wrong using and
maintenance of the boiler.
The producer recommends periodical service
controls of the boiler, 1x per year before heating
season. The service control could be done only by a
professional authorized service company or person.
The list of service control steps recommend to be
controlled before heating season you will find in the
chapter "maintenance".
The producer allows only room thermostat
connection, if the room thermostat has with potential-
free outlet connection.The authorized service person
is responsible during putting the boiler into operation
to fill and sign the guarantee card.
If you find any breakdown or any defect on an
electrical part of the boiler, please, don´t repair it by
yourself , disconnect the boiler from the electric
supply network and ask for after sales service repair
your service person.
It is not allowed to use the boiler Electric Easy for
another purposes than is stated in this instruction
manual.

1.3.4 Safety

Fire instructions:
Disconnect the boiler from the electric
supply network and take out it out of its
operation according to possibilities.
Extinguish fire using pulverized or snows
extinguish appliance flammable and
explosive materials.
Don´t stock any flammable and explosive
things closed to the boiler (for example paper,
colours, chemical etc.)