Mounting; Putting Into Operation; Boiler Operation; Safety - ATTACK ELECTRIC 08 Instructions For Use Manual

Wall hung, electric
Table of Contents

Advertisement

Mounting of the boiler could be carried out only by
authorized company or persons.
On the boiler and 100mm before the boiler there is
not allowed a placement of things from flammable
materials.
The boiler mounted on the wall is not able to be
moved or placed to another place.
Boiler connection is allowed only with nut with flat
ring sealing.
It is necessary to put heating water inlet with a filter
and shut off valves.
It is necessary to leave a free space on both side
walls of the boiler 100 mm and minimally 400mm
from the top for after sales service. In case that you
will not observe this request for free space you have
to pay dismantling and mounting the boiler back to
the wall and to heating system, it is not a repair paid
in guarantee period!

1.3.2 Putting into operation

Putting the boiler into operation has to be carried out
only by authorized professional company or service
person that has a valid agreement signed with the
producer. The list of these companies is enclosed.
The company or person who will put the boiler into
operation has an obligation to assure repairs of
breakdowns or defects in guarantee period. In case that
this company doesn't exist anymore, the guarantee
repair will be assured by any company from the list
closed to you.
By putting the boiler into operation the authorized
person is obligated to:
control connections of the boiler to electric supply
network and to heating system
control tightness of the boiler
control all functions of the boiler
inform the user about boiler operation, its control and
maintenance
inform the user about safety dimensions from sides of
the boiler from flammable walls and its protection
according to ČSN 061008 and ČSN 730823.
To fulfil requests for boiler safety and economic
operation it is necessary to observe below mentioned
conditions:
for boiler mounting and installing the user has to get the
permission from the company who is a distributor of
electricity in your region, control the input of the boiler if
it is in accordance with the input stated in the
permission
for mounting of the boiler it is necessary to have an
authorized technical project for heating system and for
connection of electric boiler
the boiler is able to be mounted only in an environment
according to its determination and according to the
project
manipulation, operation, using, control and
maintenance of the boilers are forbidden if it is not in
accordance with rules and directions of this instruction
manual. It is forbidden mainly to disconnect any of
safety units or elements in the boiler!!!
If the guarantee list is not filling fully, it is not valid
If you take the boiler from the colder environment
to the warmer one (for example if the outside
temperature is below 0° C or 0° C and you want to
m o u n t i t i n s i d e ) , p l e a s e w a i t
approximately 2 hours.
1.3.3 Operation of the boiler
The boiler has to be controlled and used only
according to advices and instructions stated
in this instruction manual, only by adult
person who was posted in maintenance of
the boiler. Putting the boiler into operation will made by
authorized service person during the heating test.
Any manipulation, operation, using and maintenance of
the boiler, which is not in accordance with instructions
and advices stated in this instruction manual, is
inadmissible. The producer is not responsible for
damages caused by wrong using and maintenance of
the boiler.
The producer recommends periodical service controls
of the boiler 1x per year before heating season. The
service control could be done only by a professional
authorized service company or person. The list of
service control steps recommend to be controlled
before heating season you will find in the chapter
"maintenance".
The producer allows only room thermostat connection,
if the room thermostat has with potentional-free outlet
connection. The authorized service person is
responsible during putting the boiler into operation to
fill and sign guarantee card.
If you find any breakdown or any defect on an electrical
part of the boiler, please, don´t repair it by yourself,
disconnect the boiler from the electric supply network
and ask for after sales service person.
It is not allowed to use the boiler ELECTRIC-EXCELLENT
for another purposes than is stated in this instruction
manual.

1.3.4 Safety

Fire instructions:
Disconnect the boiler from the electric supply
network and take out it out of its operation according
to possibilities.
Extinguish fire using pulverized or
snows extinguish appliance flammable
and explosive materials
Don't stock any flammable and explosive
things closed to the boiler (for example
paper, colours, chemicals etc.)
1.7 Description of function
1.7.1 Technical description
The boiler is designed according to valid norms
5

Advertisement

Table of Contents
loading

This manual is also suitable for:

Electric 15Electric 24

Table of Contents