Evm Overview; Analog Interface; J5: Analog Output Connector Pinout - Texas Instruments DAC8728EVM User Manual

Table of Contents

Advertisement

www.ti.com
1

EVM Overview

1.1
Features
DAC8728EVM:
Full-featured evaluation board for the DAC8728, a 16-bit, parallel input, octal output digital-to-analog
converter
Onboard or external reference selection
Onboard 5V or 2.5V reference voltage selection
Configurable for single-supply or dual-supply operation
Wide selection of digital and I/O voltages
Parallel interface compatible with the
Hardware or software control of control logic
1.2
Introduction
The DAC8728 is a 16-bit, octal, low-power, ±15V DAC that operates from independent AV
DV
supplies. A separate IOV
DD
level-shifting device between the DAC8728 and the external host controller.
As a result of the complexity of the parallel interface, the DAC8728 is not directly compatible with most of
TI's processor families (that is, it is not compatible with the Modular EVM format). Therefore, this EVM
was designed to support a wide variety of processors. Consequently, access to the parallel interface is
achieved through external logic controlled by the host processor parallel interface.
Throughout this document, the acronym EVM and the phrase evaluation module are synonymous with the
DAC8728EVM.
2

Analog Interface

Samtec part numbers SSW-110-22-S-D-VS and TSM-110-01-T-DV provide a convenient, 10-pin, dual-row
header/socket combination at J5. This header/socket provides access to the analog output pins of the
DAC. Consult Samtec at
connector options.
Table 1
shows the pinout of the analog output connector, J5.
Pin Number
J5.18 - J5.20
J1.1- J1.19 (odd)
SBAU161 – February 2010
Submit Documentation Feedback
5-6k Interface Card
supply powers the parallel I/O buffers and eliminates the need for a
DD
http://www.samtec.com
Table 1. J5: Analog Output Connector Pinout
J5.2
J5.4
J5.6
J5.8
J5.10
J5.12
J5.14
J5.16
Copyright © 2010, Texas Instruments Incorporated
for use with a wide variety of DSP starter kits
or call 1-800-SAMTEC-9 for a variety of mating
Signal
VOUT_3
DAC Analog Output 3
VOUT_2
DAC Analog Output 2
VOUT_1
DAC Analog Output 1
VOUT_0
DAC Analog Output 0
VOUT_7
DAC Analog Output 7
VOUT_6
DAC Analog Output 6
VOUT_5
DAC Analog Output 5
VOUT_4
DAC Analog Output 4
Pins are unused and should be
left open for use with future
Unused
amplifier and sensor input
modules.
AGND
Analog ground connections
EVM Overview
, AV
, and
DD
SS
Description
DAC8728EVM
3

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the DAC8728EVM and is the answer not in the manual?

Table of Contents