This is the installation and registration guide for CET Meter which is referred to as MB-63 or
6M+One device on our system. Throughout the rest of the document, the device will be
Installation guide
(Link for the SLDs: https://drive.google.com/drive/folders/1SK--jg-cPQgHH2JOm3B7fxpZGIdwI27G)
1. WARNING
DO NOT power-up the Solar Analytics device before/simultaneously with the CET
Meter. It has to be powered up a er the CET Meter.
2. The sequence
○ DO NOT power-up the Solar Analytics device before/simultaneously with the
CET Meter. It has to be powered up a er the CET Meter.
○ Install the CET device accordingly
○ Establish the Modbus connection from the CET device to the MB-63 device
○ Power up the CET device for 30 seconds
○ Power up the Solar Analytics device
3. What device are we dealing with?
PMC-220
PMC-340-BA
PMC-340-BB
PMC-220
addressed as CET Meter
— straight-through connection.
— straight-through connection.
— 3P4W method: using the White CTs.
PMC-340-BA
PMC-340-BB

Advertisement

loading

Summary of Contents for CET PMC-220

  • Page 1 This is the installation and registration guide for CET Meter which is referred to as MB-63 or 6M+One device on our system. Throughout the rest of the document, the device will be addressed as CET Meter Installation guide (Link for the SLDs: https://drive.google.com/drive/folders/1SK--jg-cPQgHH2JOm3B7fxpZGIdwI27G) 1.
  • Page 2 4. PMC-220 ○ Hardware installation Straight through connection MB-63 Modbus D (+) and D (-) (NOT ) are to be connected to Terminal 7 ▽ and 8 respectively. ○ Configuration Making sure the device has the correct ID ↵ 2s, ↓ x1, PW, ↵ x1, enter the password as 0000 to enter the configuration mode, then press ↓...
  • Page 3 ↓ until you see the CoM SET, make sure the ID is set to 100. 7. Final check — voltage test! Solar Analytics is unable to do a remote phase-swap with the CET Meter, hence, the installation has to be correct on the spot! ○...