7. Final check — voltage test!
Solar Analytics is unable to do a remote phase-swap with the CET Meter, hence, the
installation has to be correct on the spot!
○ PMC-340-BB
i.
ii.
○ PMC-340-BA
i.
ii.
FAQ
1. How can we download the CET Meter data?
○ The data can only be accessed through an API.
2. Why does the system is not allowing to set the CT1 ratio to 600?
○ See the
3. Why is the MB light on the MB-63 is not green?
○ Have you set the ID to 100?
the cr2 to 00005, ↵ 2s twice to go back to the Main Menu
next point).
Making sure the device has the correct ID
2s, ↓ x1, PW,
↵ x1, enter the password as 0000 to enter the configuration
mode, then press ↓ until you see the CoM SET, make sure the ID is set to 100.
Get the multimeter ready.
Confirm that the voltage between Terminal 4 to Terminal 1, 2, and 3 are
the same as the Terminal 4 to Phase 1, 2, and 3 respectively.
i.e. P1 to V1 should be very close to 0 and so on.
Get the multimeter ready.
Confirm that the voltage between N to Terminal L1, L2, and L3 on the
340-BA are the same as the N to P1, P2, and P3 on the MB-63 respectively.
i.e. P1 to V1 should be very close to 0 and so on.