Clinometer Reset - vimec V65 B.I. Original Instructions Manual

Hide thumbs Also See for V65 B.I.:
Table of Contents

Advertisement

f) Connect the wires (Fig. 49/c) to the side flaps, pass-
ing them around the pin (Fig. 49/a).
If the flaps do not open or close correctly, adjust to the
correct position using the adjuster fork (Fig. 49/b).
g) Close the platform by replacing the cover plate and
the fixing screws.
h) Remove the wedge and plastic band (Fig. 46/c,d)
used to hold the platform horizontal during adjustment
from the platform supports.
i) Tighten the nut and locknut to a torque of 4 daN ± 0.1
(Fig. 51/a,b).
I) Plug in the connectors J14 - J16 (Fig. 50).

CLINOMETER RESET

The platform is equipped with a clinometer to check
any footboard overloads (Fig. 52/a).
Once the platform is completely installed, it must be
FIG.49
b
FIG.50
c
a
fully open in work mode.
To remove any possible clearances, a load of around
75-100 kg must be applied to the platform (it is sufficient
that an installer gets onto the footboard to remove such
clearance).
FIG.51
FIG.52
FIG.53
35
7602040
b
a
a
a

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the V65 B.I. and is the answer not in the manual?

Subscribe to Our Youtube Channel

This manual is also suitable for:

V65 b.r.

Table of Contents

Save PDF