6) CONNECTING THE POWER SUPPLY UNIT
- Connect the wires (positive and negative) to the busbar
terminal provided, fixed to the rail (Fig. 27/a-Fig. 27/b).
- If the charge station is installed, connect the cables
leading from the station direction to the power supply
unit cables.
- Connect the 230 V 50 Hz power supply to the power
socket (Fig. 27/c).
- After installation, power up the system by connecting
the plug (Fig. 27/d).
- Connect the battery connector on the lift (Fig. 28)
and turn the on-off key on the casing to ON (Fig. 18/a
in use and maintenance manual). Once the lift has
been switched on, remove the key and keep it with
the documentation, the manual operation handwheel
and the arm release Allen key.
- For the version without key, connect the battery con-
nector (Fig. 28) and switch on the lift by keeping the
on/off button pressed down for 1 sec.
7) CONNECTING THE INSTALLATION ENGINEER'S
CONTROL PANEL
- Place the installation card (Fig. 29/b) in the slot
(Fig. 29/c) and connect the control panel (Fig. 29/a)
to the connector provided.
- Access the "Position" subroutine.
- Press "Enter".
- Type the "Password".
- From the "Control from console" menu.
- Press "Enter".
- "UP" to ascend, "DOWN" to descend.
- Temporarily fit the magnet to the rail (Fig.26/a) in line
with the home floor recognition sensor (Fig.26/b). Then
press the UP button once to acquire the home floor
position and allow the lift to move.
FIG.26
DRIVING TORQUE
POS.
1
2
3
(daN x m)
2,5
6,0
4,5
3
FIG.27
c
d
FIG.28
1
2
3
27
7602040
-
a
-
b
a
a
3
b
2
Need help?
Do you have a question about the V65 B.I. and is the answer not in the manual?