10.0 OPERATION AND INSPECTION CHECKLIST
BEFORE EACH USE, the nozzle must be inspected to this checklist:
1. There is no obvious damage such as missing, broken or loose parts, damaged labels etc.
2. Waterway is clear of obstructions
3. Coupling is tight and leak free
4. Gaskets are in good condition
5. Shaper turns freely and adjusts pattern through full range
6. Nozzle flow is adequate as indicated by pump pressure and nozzle reaction
BEFORE BEING PLACED BACK IN SERVICE, nozzles must be inspected to this checklist:
1. All controls and adjustments are operational
2. There are no broken or missing parts
3. There is no damage to the nozzle that could impair safe operation (e.g. dents, cracks, corrosion or other defects)
4. The thread gasket is in good condition
5. The waterway is clear of obstructions
6. Nozzle is clean and markings are legible
7. Coupling is retightened properly
8. Shaper is set to desired pattern
WARNING
TASK FORCE TIPS LLC
MADE IN USA · tft.com
©Copyright Task Force Tips LLC 2015-2020
Equipment failing any part of the checklist is unsafe for use and must have the problem corrected
before use or being placed back into service. Operating equipment that has failed the checklist is a
misuse of this equipment.
16
3701 Innovation Way, Valparaiso, IN 46383-9327 USA
800-348-2686 · 219-462-6161 · Fax 219-464-7155
LIZ-030 October 29, 2020 Rev13
Need help?
Do you have a question about the Master Foam Series and is the answer not in the manual?