Haier GE APPLIANCES Connect Series Service Manual page 59

Split heat pumps
Table of Contents

Advertisement

Maintenance
Note: Make sure all refrigerant has been recovered and power is isolated before removing the outdoor coil.
Step
6. Install the new outdoor
coil.
7. Secure the electric
box and arrange the
wires according to the
requirement.
8. Check and open the
upper
Outdoor Coil Removal
Picture
CONNECT SERIES SERVICE MANUAL
Work instruction
Secure the screws of coil and
support. Then fix them together on
the chassis.
Install the coil by referring to the
positions of entering and leaving
pipes. Braze the connection pipes.
Nitrogen welding: the pressure of
nitrogen is 2" to 3" W.C.
Note: When brazing the pipes, do
not let the flame burn the other
components.
Put the electric box in place and
tighten up the screws of electric
box.
Arrange and secure the wires as
original.
Check whether each component
and connection wire is well
connected.
If everything is OK, place back the
upper, left and right side panels.
57