Cooling Water Outlet; Compressed Air; Process Water; Aeration Line - BÖWE P12 Installation Instructions Manual

Hide thumbs Also See for P12:
Table of Contents

Advertisement

7
Connection
7.2.4

Cooling Water Outlet

The cooling water leaving the system can be directed to the sewer system, reused or recooled
because it circulates through the machine in a closed system and does not come into contact with the
solvent. You should reuse the cooling water if at all possible.
7.2.5

Compressed Air

The operating pressure is 6 bar (87 psi). The machine is equipped with a compressed air reducing
valve, pressure gauge and compressed air water separator. The line pressure should be 10 - 12 bar
(145 - 174 psi).
7.2.6

Process Water

Empty the process water collecting tank daily.
Dispose of the contents according to the regulations for your country.
7.2.7

Aeration Line

Machine venting and aeration is done through a carbon filter cartridge or the Slimsorba (Option).
Attention:
For machines without Slimsorba, but loading door venting a connection pipe from
the outlet valve to the outside has to be installed. If there is no connection to the
outside, the inside room concentration can get to high.
43
7
P12-P15-P18

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

P15P18

Table of Contents