Anchoring Surface; Sound And Vibration Insulation - BÖWE P12 Installation Instructions Manual

Hide thumbs Also See for P12:
Table of Contents

Advertisement

5
Installation
H
Ceiling bore holes (20 mm (3/4 in) ) for through bolt, length depending on the thickness of the
ceiling. Support if necessary
5.4.2

Anchoring Surface

Correct anchoring is extremely important for low-noise, fault-free operation. When installing on the
foundation, the use of stone bolts is preferable.
The anchoring surface must be horizontal and level.
Never place the machine directly on felt, bituminous coatings, rubber or cork.
On uneven concrete floors, you must level the machine or safety trough with leveling plates and
even out the supporting surface with filler (epoxy resins).
5.4.3

Sound and Vibration Insulation

Consult with building and insulation specialists with regard to the use of special foundations, dampers,
spring cups or similar devices for special vibration insulation.
34
5
703871-22-0
P12-P15-P18

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

P15P18

Table of Contents