Room Ventilation Control - BÖWE P12 Installation Instructions Manual

Hide thumbs Also See for P12:
Table of Contents

Advertisement

7
Connection

7.3.2 Room Ventilation Control

If there is already a room ventilation system, you can couple the automatic machine actions with the
ventilation system.
In this case, the machine starts only when the room ventilation has been turned on.
Recommendation for renewing the room air:
The room ventilation must be sufficient to meet the requirements for your country.
Example: BGR 500 Kapitel 2.14:
The minimum requirement for renewing the room air is achieved when the dissipated amount of air in
3
m
/h is equal to 60 times the numerical value of the standard loaded amount in garments in kg. The air
renewal rate can be limited to 5 per hour if the calculation results in a larger numerical value.
1 =
2 =
46


Terminals in switch panel, see machine circuit diagram
External room ventilation - room ventilation fan
  
707770-22-0
7
P12-P15-P18

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

P15P18

Table of Contents