4 Transport

In order to guarantee that no damage results from the handling, we recommend that you consult with the
appropriate experts for correct transport, installation and connection.
You must provide suitable tools and equipment for unloading, transporting, machine entry and
installation. For example: crane, forklift, elevating truck, pulley block, rope, winch, crowbar, rollers,
wooden blocks, wedges.
Attention: Note the center of gravity of the machine and secure
against lateral tipping.
Caution

4.1 Entry

Normally the machine and distillation unit are packed in a crate or shipping box and kept in an upright
position when being transported and brought in.
Package dimensions (box measurements)
P12-P15-P18
Width
Depth P12-P15 /P18
Height
Entry dimensions after unpacking (Fan is dismantled)
Width
Depth P12-P15 /P18
Height
Entry dimension without angle bracket for trough
Width
10
Slimline
mm(in)
1150(45.3)
mm(in)
2290(90.2) /2400(94.5)
mm(in)
2410(94.8)
mm(in)
1080(42.5)
mm(in)
2165(85.2) /2275(89.5)
mm(in)
1990(78.3)
mm(in)
935(36.8)
4
Crossline
1970(77.6)
1640(64.6) /1740(68.5)
2460(96.8)
1840(72.4)
1406(55.3) /1540(60.6)
1990(78.3)
1695(66.7)
P12-P15-P18

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

P15P18

Table of Contents