Transport; Entry - BÖWE M21 Installation Instructions Manual

Hide thumbs Also See for M21:
Table of Contents

Advertisement

4 Transport

In order to guarantee that no damages result from the handling, we recommend that you
consult with the appropriate experts for correct transport, installation and connection.
You must provide suitable tools and equipment for unloading, transporting, machine entry
and installation. For example: crane, forklift, elevating truck, pulley block, rope, winch, crowbar,
rollers, wooden block, wedges.
Attention: Note the center of gravity of the machine and secure
against lateral tipping.
Caution
4.1

Entry

Normally the machine is packed in a crate or shipping box and kept in an upright position
when being transported and brought in.
Package dimensions (box measurements)
Width
Depth
Height
Normal dimensions after unpacking (entry dimensions)
Width
Depth
Height (with cartridge filter)
Height (without cartridge filter)
Entry dimensions (without fan cover, without cartridge filter)
Height
Removing machine from the pallet:
Must be done by transport experts.
Lift the machine only at sturdy points.
Note the center of gravity of the machine and
secure against lateral tipping.
The machine is on all 4 edges equipped with
unscrew transport-eye hooks for crane- or rope
transport.
10
10
Machine with distillation
M21
mm (in)
2330 (91.7)
mm (in)
1650 (64.9)
mm (in)
####
mm (in)
2200 (86.6)
mm (in)
1500 (59.1)
mm (in)
2340 (92.1)
mm (in)
2180 (85.8)
mm (in)
2130 (83.9)
M26
M30
2330 (91.7)
2330 (91.7)
1780 (70.0)
1885 (74.2)
###
###
2200 (86.6)
2200 (86.6)
1630 (63.0)
1735 (68.3)
2340 (92.1)
2340 (92.1)
2180 (85.8)
2180 (85.8)
2130 (83.9)
2130 (83.9)
707761-18-0
4
4.1
M21/M26/M30

Advertisement

Table of Contents
loading

This manual is also suitable for:

M26M30

Table of Contents