Download Print this page

Installation Procedure - Keysight Technologies N9020A Installation Note

Signal analyzer
Hide thumbs Also See for N9020A:

Advertisement

Installation Procedure

Standard Instrument (Benchtop Configuration)
1. Disconnect the instrument from ac power.
2. Refer to
Figure
1. Using the T-20 driver, remove the 4 screws (1) (two on each side) that
attach the strap handles (2) on each side of the instrument.
3. Remove the four key locks from the instrument four bottom feet.
4. Remove the four instrument bottom feet.
5. Using the T-20 driver, remove the four screws (including washers) (3) that hold the rear feet
(4) in place.
6. Pull the instrument cover (5) off towards the rear of the instrument.
Installation Note N9020-90189
If the instrument is placed on its face during any of the following procedures, be
sure to use a soft surface or soft cloth to avoid damage to the front panel, keys, or
input connector.
Make sure any adapters on the front panel are removed.
If the analyzer has Option PRC, Portable Configuration, go to the
Instrument (Option PRC)"
Option BBA, Analog Baseband I/Q Inputs Retrofit Kit
section to remove the outer case.
"Portable
7

Advertisement

loading