Power-On Check - Huawei EchoLife OT925-G User Manual

Table of Contents

Advertisement

EchoLife OT925-G
User Guide
Checking Installation Environment
0 provides the checklist of the installation environment.
Checklist of the installation environment
2.6

Power-on Check

This section describes how to power on and check the OT925-G after the installation.
Powering On the OT925-G
Before powering on the OT925-G, ensure that the installation meets the requirements.
Use the multimeter to check whether the input current is in the allowed range (100–240 VAC).
Turn on the power switch of the OT925-G.
----End
Checking LED Status
Check whether the OT925-G can be powered on normally according to the LED status, as shown in
0.
Issue 02 (2007-08-30)
Item
Description
Signal cables,
Bundle signal cables or optical fibers moderately at the turning.
optical fibers
The routing of signal cables and optical fibers complies with the
engineering design, with equal space between cable ties.
Signal cables and optical fibers are routed smoothly.
All signal cables and optical fibers are arranged and bundled neatly,
without any damage on the cable or fiber sheath.
Proper margins are reserved for signal cables and optical fibers.
Cable ties are cut smooth without any sharp edge or crossover.
Item
Description
Device
The installation position of the device complies with the engineering
design.
The device is installed reliably, in compliance with the shockproof
requirements in the engineering design.
All bolts are fastened correctly and reliably.
Cabling trough
No sundries such as cable ties or cable segments can be found
around the device or the cabling trough. All parts are smooth and
clean.
Huawei Technologies Proprietary
Tables
xxxiii

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

V100r002

Table of Contents