Figure 5-1. Tg Actuator Schematic Diagram - Woodward TG-10E Installation And Operation Manual

Table of Contents

Advertisement

Manual 04045
The control port in the pilot-valve bushing (7) is covered by the land on the pilot-
valve plunger (20). This stops the power piston (6) and the actuator terminal
shaft (2) in the new position needed to run the turbine at the decreased load or
decreased-speed setting.
Increase in Load or Speed Setting
Assume that the turbine is running on-speed under steady-state conditions. The
control voltage to the actuator is therefore constant. The pilot-valve plunger (20)
is centered over the control port of the pilot-valve bushing (7) and the control
land stops the flow of pressure oil through the bushing control port. There is no
movement of the power piston (6) and no movement of the actuator terminal
shaft (2).
Woodward

Figure 5-1. TG Actuator Schematic Diagram

TG-10E/-13E/-17E Actuator
25

Advertisement

Table of Contents
loading

This manual is also suitable for:

Tg-13eTg-17e

Table of Contents