Woodward TQ-125 Linkage Installation And Adjustment
Woodward TQ-125 Linkage Installation And Adjustment

Woodward TQ-125 Linkage Installation And Adjustment

Hide thumbs Also See for TQ-125:

Advertisement

Application Note 01300
(Revision NEW, 9/2000)
Original Instructions
TQ-125
Linkage Installation and Adjustment
Woodward reserves the right to update any portion of this publication at any time. Information provided by Woodward is
believed to be correct and reliable. However, no responsibility is assumed by Woodward unless otherwise expressly
undertaken.
Copyright © Woodward 2000
All Rights Reserved

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the TQ-125 and is the answer not in the manual?

Questions and answers

Summary of Contents for Woodward TQ-125

  • Page 1 TQ-125 Linkage Installation and Adjustment Woodward reserves the right to update any portion of this publication at any time. Information provided by Woodward is believed to be correct and reliable. However, no responsibility is assumed by Woodward unless otherwise expressly undertaken.
  • Page 2 Linkage Installation and Adjustment General The linkage kit for the TQ-125 generally consists of the following parts: two rod ends, a terminal lever, a length of threaded rod, and the associated hardware to attach these items between the TQ-125 and the prime mover fuel control.
  • Page 3 Email and Website—www.woodward.com Woodward has company-owned plants, subsidiaries, and branches, as well as authorized distributors and other authorized service and sales facilities throughout the world. Complete address / phone / fax / email information for all locations is available on our website.

Table of Contents