Install Pressure Relief Valve Kit #R0336102 - Jandy JXi 200 Installation And Operation Manual

Gas-fired pool and spa heater
Table of Contents

Advertisement

Page 52
ENGLISH
5.5.1 Install Pressure Relief Valve kit # R0336102
Please double check that you have all necessary parts
to complete the installation. If any parts are missing or
damaged please call 1-800-822-7933 for assistance.
4
3
2
ITEM
DESCRIPTION
1
Pressure Relief Valve 3/4" X 3/4" 75 PSI
2
Brass Nipple 3/4"
3
Elbow 90° 3/4" NPT Brass
4
Teflon Tape
Prior to installing or replacing this pressure relieve valve
(PRV), ensure the following steps have been completed.
Turn off the electrical power to the heater.
Turn off the main gas supply to the heater.
If the heater has been operating, ensure you allow
enough time for remaining water in the heat
exchanger to cool down before beginning. It is
recommended that protective gloves be worn during
the entire procedure.
Make sure the filter pump is off and will remain off
for the duration of the installation procedure.
If the heater is below the surface level of the water in
the pool or spa, close all shut-off valves between the
heater and the pool.
a
Remove drain plug from header and allow all water to
drain from heat exchanger.
b
Remove the port plug on Thermal Regulating Valve access plate.
c
Each male connection should be first wrapped in 5-6 turns
of Teflon® tape.
d
Assemble the 3/4" threaded nipple and elbow. Make sure to
Jandy
, JXi
®
1
BRONZE HEADER
X
X
X
X
b
a
Gas-Fired Pool & Spa Heater
get a sung fit. Do not overtighten.
e
Install the nipple and elbow assembly at the access plate port.
c
f
Install the pressure relief valve. Make sure to get a sung fit.
Do not overtighten.
The final orientation of the pressure relief valve should be vertically
aligned with the discharge opening facing away from the heater header.
g
Install a discharge pipe from the pressure relief valve
discharge opening to a safe area. This is a precaution to prevent
the possibility of personal injury or property damage in the
event scalding water is discharged from the pressure relief valve.
h
Install the discharge pipe so that there is no trapped or
standing water in the piping. Discharge piping must be facing
down, terminating with a threadless nipple, no more than
6 in (152 mm) and no less than twice the diameter of the
discharge pipe from the floor or drain/receptor..
To ensure the continued proper operation of the pressure
relief valve, the valve should be tested once a year. To
test, lift the lever with the circulation system running to
ensure that water will pass through. When the lever is
down, there should be no leaks from the outlet.
|
Installation & Operation Manual
f
e
d
Threadless Discharge Pipe
Øa
g
6 in (152 mm) Max
h
2 X (Øa) Min.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Jxi 260Jxi 400Jxi200 seriesJxi260 seriesJxi400 seriesJxi200n ... Show all

Table of Contents