Download Print this page

EBARA DSC4 Series Operating Instructions, Installation & Maintenance Manual page 8

Submersible wastewater, sewage pump

Advertisement

INSTRUCTION MANUAL
Pour the specified oil into the sealing chamber through the "oil port" until the oil flows
out of the "air vent". (See Table 1)
After the sealing chamber is filled to the specified level, put a sheet gasket between
the plug and the boss, and tighten the plug.
PM32U
Oil funnel
Floor surface
Fig. 9
Use one of the following oils or
equivalent.
Turbine Oil ISOVG32
Shell
Mobil
Esso
Exxon : Teresstic 32
Gulf
Caltex : Rega Oil R&O 32
: Turbo oil T32
: Mobil DTE oil light
: Esso Tresso 32
: Harmony 32, Crest 32
P.7

Advertisement

loading