Download Print this page

EBARA DSC4 Series Operating Instructions, Installation & Maintenance Manual page 35

Submersible wastewater, sewage pump

Advertisement

INSTRUCTION MANUAL
*ICS opt.
(3)
When removing "1. Lower stationary side & rotating side assy" or "5. Upper
stationary side assy", use two push bolts (M5).
(There are two female threads (M5) on the flange part of each assy.)
For assembly, reverse the above steps.
After installing the mechanical seal, fill the above female threads (for push
bolts) with the silicon-rubber sealant (SHIN-ETSU CHEMICAL Co., Ltd.
KE-45 or equivalent).
CAUTION : DO NOT COMPLETELY DISASSEMBLE THE MECHANICAL
!
SEAL.
6. Key
PM32U
Mechanical seal replacement (Refer to Fig. 24c)
5. Upper
stationary side
assy
4. Inner casing
3. Upper
rotating side
assy
Fig. 24c
P.34
2. Side plate
1. Lower
stationary side
& rotating side
assy

Advertisement

loading