Download Print this page

EBARA DSC4 Series Operating Instructions, Installation & Maintenance Manual page 16

Submersible wastewater, sewage pump

Advertisement

INSTRUCTION MANUAL
3.8 Cable Installation (Fig. 13)
When the pump has been installed, pull out the power cable, protective device cable,
water level switch cable, etc. from the cable lead-out elbow on the floor and connect
them to the control panel.
CAUTION : HANDLE THE CABLES VERY CAREFULLY. IF THEY ARE BENT
!
OR PULLED EXCESSIVELY, THE CABLE AND THE MOLDED SEAL MAY BE
DAMAGED, RESULTING IN INSULATION FAILURE.
ALSO, CARE IS NEED TO PROTECT CABLE ENDS AGAINST WATER
INTRUSION.
Note : The cables should be cut to the necessary length.
If the cable is too short, it can prevent lifting of the pump.
If the cable is too long and laid loose on the pump pit bottom, it could be sucked into
the pump.
If left coiled on the ground, it could be locally heated.
3.9 Floor Plate
Finally, install the floor plate over the pump pit, and the installation work is finished.
PM32U
CABLE LEAD-OUT ELBOW
Fig. 13
FLOOR PLATE
P.15

Advertisement

loading